South Padre Island Utility Extension

5 Mile Utility Extension on South Padre Island 

Location:  South Padre Islan​d, TX

Client:  Laguna Madre Water District

Description:

​This project included 16 inch waterline, sewer forcemain, and reuse lines.  Because of the project's proximity to the shoreline, mitigation efforts were required as part of the contract.  The mitigation portion of the project consisted of moving 100,000 cubic yards of beach sand from the west side of Highway 100 back to the east side, which is where it was before winds carried it across the road.​

Reuse "purple" pipe ready to install

​Loading sand from the west side of HWY 100